1) If next monthly deposit in RD account opened between 1st and 15th of a month is not deposited by 15th of following month and next monthly deposit in RD account opened between 16th and last working day of a month is not deposited by last working day of the following month , then it will be treated at Defaulted month.
2) If in any RD account, there is monthly default(s), the depositor has to first pay the defaulted monthly deposit with default fee and then he can pay the current month deposit.
3) Certificate suffix will be changed from 6 to 8 digits in Data Entry module
Pre-Requisite
Sanchay Post 7.5 Service Pack 1 Should be Installed.
Sanchay Post 7.5 SP1 Download : Download
Download Sanchay Post 7.5 Patch 5 from the above Link.
Install / upgrade to latest version in both Server and Client Machine.
Instruction : Download
कोई टिप्पणी नहीं:
एक टिप्पणी भेजें